Skip to content
Ashlar-pattern paver patio laid tight against a home's foundation wall.

Service Area · Black Forest, CO

Black Forestpatios built forfire code.

Black Forest sits at 7,369 feet — the highest ground Apex Patios works — on acreage lots with well and septic and, since July 2026, a wildfire-resiliency code that changes what belongs against your house. A concrete or paver patio is one of the few surfaces that answers all three at once.

Your patio is wildfire mitigation

The Colorado Wildfire Resiliency Code took effect across El Paso County on 1 July 2026. In designated wildland-urban interface areas it calls for defensible space and non-combustible material in the zone immediately against the structure — which is exactly what a concrete slab or a paver field is. Replacing bark mulch and wood decking along the first five feet of your house with hardscape does double duty: it is the outdoor living space you wanted, and it is the ember-resistant buffer the code is asking for.

7,369 feet of freeze-thaw

Black Forest is roughly 1,300 feet higher than Fountain and around 400 feet higher than Monument. More elevation means deeper, longer, more frequent freeze-thaw cycling, and that is precisely the load an under-built slab fails under. This is the service area where the Stronghold tier's eleven inches below grade — 5-inch fiber-reinforced slab at 4,500 PSI over six inches of compacted base — earns its cost most clearly.

Acreage, wells and septic fields

Lots here are typically 2.5 acres or larger with no municipal water or sewer. That means the site visit matters more than usual: a septic leach field cannot be built over, and its location often decides where the patio goes. The upside is room — large lots take large patios, and there is space to bring equipment in without tearing up a narrow side yard.

Service Area · Black Forest, CO

Common Questions

Does a patio help with the new Black Forest fire code?

It can. The Colorado Wildfire Resiliency Code, effective across El Paso County on 1 July 2026, asks for non-combustible material and defensible space in the zone immediately around the structure. Concrete and pavers are non-combustible, so replacing mulch or wood decking against the house with hardscape works with the code rather than against it. Confirm your specific requirements with El Paso County or Black Forest Fire Rescue — the designated areas and details vary by parcel.

Do I need a building permit for a patio in Black Forest?

For a ground-level uncovered patio, generally no. Pikes Peak Regional Building Department does not regulate concrete flatwork under the building code unless a structure is placed on it. A covered patio or a pergola is different — that needs a permit with footing specifications and post-to-beam details. Apex handles that conversation as part of the estimate.

Will my septic system limit where the patio can go?

Usually yes, and it is the first thing we look at. A leach field cannot be built over, so on an acreage lot with septic the field's location often sets the patio's footprint before anything else does. We walk it with you at the free estimate so the layout is settled before any price is written.

0" — Service Detail

Start with a site visit and a real price.

Book a free estimate in Colorado Springs or the surrounding Front Range. Apex provides a transparent price the same day as the visit.

Book a Free Estimate